top of page

INTU Lakeside ceiling refurbishment 

Our team carried out the repair and redecoration of all ceilings and walls to level 1 at INTU Lakeside shopping centre over an 8 week period finishing 2 weeks ahead of schedule. 

IMG_E0469.JPG
IMG_0407.JPG
IMG_0400.JPG
IMG_0215.JPG
IMG_E0398.JPG
IMG_0211.JPG
IMG_0219.JPG
IMG_0218.JPG
bottom of page